ADM Lifecycle
This page outlines the ADM steps graphically
Step-by-step guide
- Starting at the RAW being created through the pressure points being triggered in phase H
- High level (20K ft) work being done in phase A
- More detailed architectural analysis being in done in phases B, C and D, yielding ABBs and identifying SBBs
- Selecting the SBBs in E and re-evaluating the BTEP and PESTLE results of phase A because of the time difference between phase E and A
- Using phases E and F to create the information that will be used to construct Architecture Contracts and that will be used to manage the relationship between the business and the delivery team in phase G
Related articles