This page outlines the ADM steps graphically
Step-by-step guide
- Starting at the RAW being created through the pressure points being triggered in phase H
- High level (20K ft) work being done in phase A
- More detailed architectural analysis being in done in phases B, C and D, yielding ABBs and ABBs
- Selecting the SBBs in E and re-evaluating the BTEP and PESTLE results of phase because of the time difference between phase E and A
- Using phases E and F to create the information that will be used to construct Architecture Contracts and that will be used manage the relationship between the business and the delivery team in phase G
Info |
---|
|
Related articles
Filter by label (Content by label) |
---|
showLabels | false |
---|
max | 5 |
---|
spaces | DIS |
---|
sort | modified |
---|
showSpace | false |
---|
reverse | true |
---|
type | page |
---|
labels | togaf building-blocks |
---|
|